Refurbishing part of the first target station proton beamline (EPB1)

EPB1 is made up of 68 magnets all of which are roughly 50 years old. Many of the electrical windings of these magnets are deteriorating (especially in high radiation-dose areas near the downstream end of EPB1). Replacement of magnets upstream of the muon target and between the muon target and the neutron target will take place during the 2014/15 shutdown.

Bookmark and Share
Skip to the top of the page